01 · QUESTION / INTENT
Separate proof that a cell/battery type passed transport tests from preparation of a compliant consignment.
02 · DIRECT ANSWER
A UN 38.3 test summary identifies a tested cell or battery type and reports the required test information. It is necessary evidence for many lithium-battery movements, but it does not by itself approve a shipment. Actual compliance also depends on classification, exact configuration, state of charge, packaging, marks, labels, documentation, trained parties, carrier/operator variations and the current rules for the route and mode.
03 · DECISION TABLE
| Decision factor | Decision direction | Confirm before approval |
|---|---|---|
| Type evidence | Match manufacturer, model, mass/Wh and report identity. | Summary fields, test lab, report number/date and manual revision. |
| Consignment | Classify cells/batteries and packed/contained configuration. | UN number, packing instruction, quantity, SOC and package. |
| Route acceptance | Check each carrier and transfer point before booking. | Mode rules, operator variations, state approvals and cut-off dates. |
04 · ENGINEERING EXPLANATION
Maintain a shipment dossier that links exact serial/lot and configuration to the type evidence. Recheck when the cell, battery assembly, packaging, SOC, quantity, route or applicable edition changes.
05 · APPLICATION / MARKET MAPPING
Standalone cells commonly move as UN 3480; batteries packed with or contained in equipment may fall under UN 3481. The applicable packing and carrier rules depend on the exact case and current mode regulations.
06 · EVIDENCE AND TEST CONDITIONS
- Valid test summary matching the exact cell/battery type.
- Current route-specific packing, marking, labelling, declaration and acceptance records.
07 · RISKS / NOT SUITABLE WHEN
- A test-summary PDF does not prove that packaging or carrier acceptance is correct.
- Air rules and operator variations change; use trained dangerous-goods personnel for each shipment.
08 · FAQ
Can a distributor issue the test summary?
The summary must contain the required manufacturer/laboratory/report information and be made available by the responsible supply chain; verify authenticity and scope.Does 30% SOC apply to every mode?
No. Requirements depend on mode, configuration and current rules; air transport has specific restrictions that must be checked at booking.BUYING COMMITTEE ANSWERS
Engineering
Ensures model/configuration changes trigger re-review.Procurement
Books only after route, package and evidence are confirmed.Quality
Verifies summary authenticity, lot/model link and shipment records.Compliance / Logistics
Owns current-mode classification and carrier acceptance.Finance / Project
Budgets compliant packaging, route options, delays and exceptions.Management
Prevents schedule commitments before a compliant route is available.10 · PROJECT CTA
