Connect the AC case to the DC envelope
Convert the revenue and dispatch case into cell current, SOC window, thermal distribution, cell count and control limits. Model tolerance and ageing so the weakest permitted cell remains inside the operating envelope.
Treat evidence gaps as project risks
Missing life data, model identity, change control or shipment evidence should become a named action with an owner and due date before design freeze.
